Search

Design Standards

Main Procurement Process for Warehouse Racks

The main procurement process for warehouse racks includes the following steps:

  1. 1 The demander puts forward requirements for the warehouse rack system.
  2. 2 The supplier conducts scheme design and model selection.
  3. 3 Discussion and optimization of the scheme.
  4. 4 Evaluation of the scheme's rationality and optimization level.
  5. 5 Quotation provision.
  6. 6 Selection of the supplier.
  7. 7 Signing of the contract.
  8. 8 Detailed technical design of the rack system.
  9. 9 Manufacturing of the rack system (including material preparation, processing, surface treatment, packaging, etc.).
  10. 10 Installation of the rack system.
  11. 11 Acceptance inspection.

Requirements of the Demander for the Warehouse Rack System

The demander's requirements for the warehouse rack system usually include:

  • Warehouse floor plan.
  • Specifications, characteristics and weight of unit (packaged) goods.
  • Specifications, stacking height and load capacity of unit pallet goods.
  • Storage and retrieval methods (manual retrieval, mechanical retrieval, automated retrieval) and retrieval equipment.
  • Requirements for storage and retrieval volume.
  • Requirements for inbound and outbound frequency.
  • Requirements for the management system.
  • Control methods.